RDL Backflow Testers
Central Ohio backflow tester with published per-device prices for Columbus, Del-Co, Bexley, Gahanna, Reynoldsburg and other water systems. You don't need to be home for an outdoor test; book by email at [email protected].
Compare 6 verified local providers approved for City of Columbus Division of Water, Backflow Compliance Office (Columbus's Tokay online test submittal system (columbus.tokaytest.com). Only City-approved testers have log-ins, so your tester files the results for you. You can check your own test status on the Backflow Compliance Office Customer Portal.) and City of Columbus Department of Public Utilities, Division of Sewerage and Drainage Industrial Pretreatment Program commercial grease interceptor pump-out manifests (follow the schedule on your utility notice or permit).
Tell us when your last backflow test or grease trap pump-out was and how often it’s required. We’ll email you a confirmation now, then a reminder about 30 days and again about 7 days before the next one is due (for pump-outs every 45 days or less, just the 7-day reminder) — so you don’t get hit with a late notice, fine, or water shutoff.
For providers: get exclusive quote-form leads in your city ($149/mo bundle).
| Official Program | Columbus Cross-Connection & Backflow Control Program (Columbus City Code Chapter 1113 and Department of Public Utilities Rule and Regulation 23-02) ↗ |
|---|---|
| Filing Portal & Fee | Columbus's Tokay online test submittal system (columbus.tokaytest.com). Only City-approved testers have log-ins, so your tester files the results for you. You can check your own test status on the Backflow Compliance Office Customer Portal. The City bills an annual fee of $25 per device (City Code 1105.09), on top of whatever your tester charges for the test. |
| Tester Registry | View Official Municipal Tester List ↗ |
| Annual Deadline Rule | Every backflow prevention assembly the Division of Water tracks must be tested at least every 12 months by a tester approved by the City of Columbus. Your tester must file the results online within 5 days of the test, and the office processes reports within 2 business days. If a device fails, it must be repaired and retested within 21 days. Only properties served by Columbus Division of Water count here; customers of Westerville, Del-Co, Gahanna, Reynoldsburg, Bexley, Obetz and other systems file with their own water provider. |
| Non-Compliance Penalty | Late properties get a past-due violation notice, then a Backflow Compliance Final Notice that sets a shut-off due date. After 21 days' notice the City can terminate water service (City Code 1101.03), and you have 10 days after the notice to request a hearing. If a failed device protects against a severe health hazard, water can be shut off immediately. Renewal-of-service fees apply after a shutoff. |
| Utility Contact | (614) 645-6674 (Backflow Compliance Office, weekdays 7:00am-3:30pm) / [email protected] • Backflow Office, 910 Dublin Road, Columbus, OH 43215 |
| Official Program | Columbus FOG Reduction Program (Columbus City Code 1145.04(B) and 1145.20(B), Director's Rules 15-04 and 26-01) ↗ |
|---|---|
| Mandatory Pumping Schedule | Every food service operation in Columbus and the 22 suburbs that send wastewater to Columbus must keep a written FOG Best Management Plan and a Grease Interceptor Cleaning Log. Cleaning frequency follows the manufacturer's instructions and how fast grease builds up; for new and remodeled kitchens the designed service interval can't exceed 30 days for concrete gravity interceptors or 90 days for interceptors made of corrosion-resistant materials. Each cleaning must remove the entire contents, including solids and material stuck to the baffles and walls (Director's Rule 26-01). |
| Manifest & Hauler Rule | Keep a separate cleaning log for each grease interceptor in a permanent log book for at least 3 years, on site with your FOG plan. The hauler must fill it in (date, gallons or percent of grease and solids removed, and condition) or give you that information in writing. |
| Violation Fines | Director's Rule 15-04 sets a minimum cost recovery charge of $2,000 per sewer blockage caused by improper grease disposal, and more when clearing it takes over four hours. |
| Environmental Desk | (614) 645-5876 (Industrial Pretreatment Program) / [email protected] |
| Governing Code | Columbus City Code Chapter 1113 (Sec. 1113.01) and Department of Public Utilities Rule and Regulation 23-02; termination of service under City Code 1101.03 |
Filter by residential availability, 24/7 emergency response, or direct electronic utility portal filing.
Central Ohio backflow tester with published per-device prices for Columbus, Del-Co, Bexley, Gahanna, Reynoldsburg and other water systems. You don't need to be home for an outdoor test; book by email at [email protected].
Columbus irrigation company that tests sprinkler-system backflow devices, handy if you also need irrigation repairs.
New Albany plumbing company offering certified backflow testing for homes and businesses around Columbus, plus repairs if a device fails.
Columbus grease trap and interceptor pumping, cleaning and installation for restaurants, schools and cafeterias, with after-hours service and cleaning-log documentation.
Restaurant grease trap cleaning, used cooking oil pickup and kitchen line jetting across Columbus, with a 24 to 48 hour response time.
Commercial grease trap pumping and maintenance plans for Columbus kitchens, with full pump-outs, wall scraping and documentation for inspections.
Failed an annual inspection or preparing for winter freeze warnings? Order code-approved ASSE backflow rebuild kits, insulated enclosures, and PDI-certified commercial grease traps before your re-test.
Prevents $400–$900 winter freeze bursts on exterior PVB & RPZ irrigation and commercial assemblies with heavy-duty weatherproof insulation and locking grommets.
Complete first/second check & differential relief valve rubber repair kits (O-rings, discs, springs, and diaphragm) to pass a failed annual test without replacing the entire brass body.
Code-required high-hazard commercial, restaurant, medical, and irrigation replacement assembly with quarter-turn ball valves and top-access check seats.
Code-compliant indoor hydromechanical grease interceptor (HGI) for cafes, delis, coffee shops, and small commercial kitchens with flow-control fitting and removable baffles.
Check what your job should actually cost in Columbus & Franklin County before accepting an inflated quote—and compare against municipal non-compliance penalties.
Lock in high-intent homeowner backflow tests, commercial RPZ certifications, and recurring restaurant grease interceptor contracts in Columbus & Franklin County, OH with zero middleman lead-broker markup.
Direct answers sourced from City of Columbus Division of Water, Backflow Compliance Office and City of Columbus Department of Public Utilities, Division of Sewerage and Drainage Industrial Pretreatment Program regulations.
At least every 12 months, by a tester approved by the City of Columbus. If the device fails, it must be repaired and retested within 21 days. Questions go to the Backflow Compliance Office at (614) 645-6674.
Your tester files the results online through the City's Tokay system within 5 days of the test, and the office processes them within 2 business days. You can check your status on the Backflow Compliance Office Customer Portal using the account number on your bill.
You'll get a past-due violation notice and then a Final Notice with a shut-off due date. After 21 days' notice the City can shut off your water, and you have 10 days to request a hearing. Severe health hazard devices that fail can be shut off immediately.
As often as the manufacturer's instructions and your grease buildup require. For new and remodeled kitchens the designed interval can't exceed 30 days for concrete gravity interceptors or 90 days for corrosion-resistant ones. Keep a cleaning log for each interceptor for at least 3 years. Contact the Industrial Pretreatment Program at (614) 645-5876.
Tell us when your last backflow test or grease trap pump-out was and how often it’s required. We’ll email you a confirmation now, then a reminder about 30 days and again about 7 days before the next one is due (for pump-outs every 45 days or less, just the 7-day reminder) — so you don’t get hit with a late notice, fine, or water shutoff.
For providers: get exclusive quote-form leads in your city ($149/mo bundle).
Tell us what you need. Your request goes to FlowComply Directory and, in cities with an exclusive featured pro, straight to that certified tester or permitted hauler too, so they can quote you. You’ll get a follow-up by phone or email.